Support Ministry Team
subgroup: Property oversight
Last meeting: March 3,
2008
Attendees:
Jeff
Boettcher
Rich
Erickson
LeAnne McFadden
John
Notebaart
Walt
Rugland
Jody
Schneider
John Zweig
Guest:
Brenda Smongeski
Staff: Jenell
Kruger
Absent:
Tom Feller
Important items of information: (DS=Downtown
Site, NS=North Site)
·
Budget
report –
·
Items
proposed to support –
Old business
Ø Durkee Street rental
property discussion concerning use as an art studio:
o
Insurance – FELC has a renter’s policy, which does not cover
the personal property of artists.
o
Basement still needs cleaning and new light bulbs.
o
Pastor Detweiler will oversee artists using the lower level
art studio facility.
Ø ARL has completed
the installation of rain gutters on the north side of the NS carport.
Ø Building security –
tabled.
Ø Central Temp has
completed the work on AHU 6 at the NS:
ü Replacement of the
existing motor starter due to a burned power leg connection.
ü Installation of 3
separate dampers in the existing combustion air duct. There are no existing
dampers, which has caused frozen pipes on 2 different occasions.
Ø Corcoran Glass
invoice for the DS safety rail project will be paid. John N. will pick up the
posts and hardware, which will be stored at the DS to continue the project at a
later date.
Ø Scott Bastein of
ARL, a Boldt representative, John Notebaart and Jenell met on Tuesday, Feb. 12,
to discuss leaks in the NS sanctuary, cupolas and flat roof. Committee
discussed the repair proposal for the cupola: Boldt would supply the crane and
crane operator for $200 per hour for the crane and hourly wage of operator;
Scott Bastein of ARL would do the necessary copper flashing repair and
inspection; Pella window would reseal perimeter of windows.
A decision was made
by the committee to proceed with the necessary repair. Jenell will make the
contacts to proceed with this project.
Ø Committee approved replacing
a broken downspout at the DS. This was due to ice buildup. ARL will install a
larger flashing and replace the broken downspout when the weather permits. A
heat tape will also be added to this area to alleviate this problem in upcoming
years.
Ø Update on NS sewer
and water installation: No recent contact has been made. Brenda will contact
John Barts, Martenson & Eisele, for direction and time line for this
project.
Ø Brenda reported on
the repair cost of the DS organ room. Total cost came to approximately $5,000.
Ø Committee continued
discussion on the hiring of a DS maintenance person.
New business
Ø Committee reviewed
information concerning the upcoming public hearing notice for the proposed zone
changes concerning the area around the NS.
Following discussion, the group decided it was not necessary to have a
FELC representative at this meeting.
Ø Jenell reported two
leaks at the NS due to ice and snow:
o
Front office entry, on ceiling
o
LL youth room; water came in under door
Scott, from ARL,
inspected the office ceiling leak, chopped away ice and snow on roof and in
rain gutter and suggested heat tapes to prevent this in upcoming years, same
for the flat roof in above the NE corner of the Sanctuary.
Jenell used a wet
vac to take up the water in the carpet in the youth room. Will run fan until it
is dry.
Next property oversight meeting is
at 6 p.m. on Monday, April 7, at NS
Submitted
by:
Jenell
Kruger